Typical project range

CAPACITY1–50 MW per site
MOUNTINGFixed tilt
GRID VOLTAGE11 kV, 33 kV, 110 kV, 230 kV
DELIVERYTurnkey EPC or EPC + O&M

Frequently asked questions

How long does a 10 MW solar plant take to build in Tamil Nadu?
Typically 6–9 months from approvals to commissioning, depending on land readiness and grid
connectivity.
How much land is needed per MW?
Roughly 3 – 3.5 acres per MW for a fixed-tilt ground-mount plant, depending on module wattage and layout.
Do you handle grid approvals?
Yes. We manage CEIG approval, TANGEDCO/TNGECL connectivity and synchronisation.
Can battery storage be added later?
Yes. We design layouts with space and cable routes for a future BESS.