| CAPACITY | 1–50 MW per site |
| MOUNTING | Fixed tilt |
| GRID VOLTAGE | 11 kV, 33 kV, 110 kV, 230 kV |
| DELIVERY | Turnkey EPC or EPC + O&M |
Frequently asked questions
How long does a 10 MW solar plant take to build in Tamil Nadu?
Typically 6–9 months from approvals to commissioning, depending on land readiness and grid
connectivity.
connectivity.
How much land is needed per MW?
Roughly 3 – 3.5 acres per MW for a fixed-tilt ground-mount plant, depending on module wattage and layout.
Do you handle grid approvals?
Yes. We manage CEIG approval, TANGEDCO/TNGECL connectivity and synchronisation.
Can battery storage be added later?
Yes. We design layouts with space and cable routes for a future BESS.